2340 E 45TH AVENUE
Vancouver, British Columbia, V5R3B5
View on Google MapsPermit Details
Location
Work Description
Addition / Alteration — Renovation - Residential - Lower Complexity — Field Review - Addition / Alteration - 2340 E 45th Ave Exterior and interior alterations to provide repair and restoration due to fire damage to this existing single detached house on this site. Scope of work: Replace all windows in existing opening. All exterior walls are existing to remain. Insulation, vapour barrier & gwb to be replaced from inside. All interior walls frame to be remained. Gwb & finishes to be replaced. All electrical fixtures & wires removal & replacement. All cabinet & fixture replacement. All finishes, including ceiling, wall & flooring replacement. Related to CF-2026-000833 and CF-2025-009673 OK for field review per O. Luo, Jan 28th, 2026
Inferred Trades
Trade tags are inferred from the work description and are not from the original source.
Data Source
Raw Source Data
{
"geom": {
"type": "Feature",
"geometry": {
"type": "Point",
"coordinates": [
-123.0581176,
49.2291374
]
},
"properties": {}
},
"address": "2340 E 45TH AVENUE, Vancouver, BC V5R 3B5",
"applicant": "Harry Leung",
"issuedate": "2026-03-04",
"issueyear": "2026",
"yearmonth": "2026-03",
"typeofwork": "Addition / Alteration",
"propertyuse": [
"Dwelling Uses"
],
"geo_point_2d": {
"lat": 49.2291374,
"lon": -123.0581176
},
"geolocalarea": "Victoria-Fraserview",
"permitnumber": "BP-2026-00339",
"projectvalue": 100000,
"permitcategory": "Renovation - Residential - Lower Complexity",
"applicantaddress": "5050 Payne Street\r\nVancouver, BC V5R 4J6",
"permitelapseddays": 35,
"buildingcontractor": "Ga Mon Leung (Harry)",
"projectdescription": "Field Review - Addition / Alteration - 2340 E 45th Ave\n\nExterior and interior alterations to provide repair and restoration due to fire damage to this existing single detached house on this site.\n\nScope of work:\nReplace all windows in existing opening.\nAll exterior walls are existing to remain. Insulation, vapour barrier & gwb to be replaced from inside.\nAll interior walls frame to be remained. Gwb & finishes to be replaced.\nAll electrical fixtures & wires removal & replacement.\nAll cabinet & fixture replacement.\nAll finishes, including ceiling, wall & flooring replacement.\n\nRelated to\nCF-2026-000833 and CF-2025-009673\n\nOK for field review per O. Luo, Jan 28th, 2026",
"specificusecategory": [
"Single Detached House"
],
"permitnumbercreateddate": "2026-01-28",
"buildingcontractoraddress": "5050 PAYNE ST \r\nVancouver, BC V5R 4J6"
}