Permit Details
Estimated Cost$2,900,000
Permit #26 206349 BLD
Issued—
Expires—
Completed—
Last updatedJul 26, 2026
Location
Street••• COLLEGE ST
CityToronto
ProvinceOntario
PostalM5S
CountryCA
Work Description
LEAP Project - U of TInstalling a single Heat Recovery Unit (HRU) located on the roof of the existing Block C of the Medical Sciences Building, located at 1 King¿s College Cir., Toronto, ON. The ducts from the HRU will penetrate the east side of the existing precast concrete clad exhaust stack enclosure and connect to existing ductwork and electrical systems.
Inferred Trades
RoofingHvacElectricalConcrete
Trade tags are inferred from the work description and are not from the original source.
Data Source
SourceCity of Toronto — Active Building Permits
Source IDtoronto_ckan
IngestedJul 25, 2026
Record ID5250f7ee-88b7-41fe-866f-7e9a8cff6aea
Raw Source Data
{
"_id": 111148,
"WORK": "Other(BA)",
"GEO_ID": "7793159",
"POSTAL": "M5S",
"STATUS": "Application On Hold",
"ASSEMBLY": 0,
"WARD_GRID": "S1139",
"DEMOLITION": 0,
"INDUSTRIAL": 0,
"MERCANTILE": 0,
"PERMIT_NUM": "26 206349 BLD",
"STREET_NUM": "150",
"CURRENT_USE": "University",
"DESCRIPTION": "LEAP Project - U of TInstalling a single Heat Recovery Unit (HRU) located on the roof of the existing Block C of the Medical Sciences Building, located at 1 King¿s College Cir., Toronto, ON. The ducts from the HRU will penetrate the east side of the existing precast concrete clad exhaust stack enclosure and connect to existing ductwork and electrical systems.",
"ISSUED_DATE": null,
"PERMIT_TYPE": "Building Additions/Alterations",
"RESIDENTIAL": 0,
"STREET_NAME": "COLLEGE",
"STREET_TYPE": "ST",
"BUILDER_NAME": null,
"PROPOSED_USE": "University",
"REVISION_NUM": "00",
"INSTITUTIONAL": 0,
"COMPLETED_DATE": null,
"EST_CONST_COST": "2,900,000",
"STRUCTURE_TYPE": "University",
"APPLICATION_DATE": "2026-07-22",
"STREET_DIRECTION": " ",
"DWELLING_UNITS_LOST": "0",
"INTERIOR_ALTERATIONS": 0,
"DWELLING_UNITS_CREATED": "0",
"BUSINESS_AND_PERSONAL_SERVICES": 0
}