Permit Details
Estimated Cost$11,067,801
Permit #23 221838 STS
Issued—
Expires—
Completed—
Last updatedJul 26, 2026
Location
Street••• DANFORTH AVE
CityToronto
ProvinceOntario
PostalM4J
CountryCA
Work Description
Drain - Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and building Pape underground stations
Inferred Trades
Plumbing
Trade tags are inferred from the work description and are not from the original source.
Data Source
SourceCity of Toronto — Active Building Permits
Source IDtoronto_ckan
IngestedJul 26, 2026
Record ID89df8066-4353-4c6c-9d65-e7b8d7bbac66
Raw Source Data
{
"_id": 160527,
"WORK": "Inside and Outside Drains",
"GEO_ID": "7569319",
"POSTAL": "M4J",
"STATUS": "Application Acceptable",
"ASSEMBLY": 0,
"WARD_GRID": "S1425",
"DEMOLITION": 0,
"INDUSTRIAL": 0,
"MERCANTILE": 0,
"PERMIT_NUM": "23 221838 STS",
"STREET_NUM": "680",
"CURRENT_USE": "Transit",
"DESCRIPTION": "Drain - Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and building Pape underground stations",
"ISSUED_DATE": null,
"PERMIT_TYPE": "Drain and Site Service",
"RESIDENTIAL": 0,
"STREET_NAME": "DANFORTH",
"STREET_TYPE": "AVE",
"BUILDER_NAME": null,
"PROPOSED_USE": "Transit ",
"REVISION_NUM": "00",
"INSTITUTIONAL": 0,
"COMPLETED_DATE": null,
"EST_CONST_COST": "11067801.00",
"STRUCTURE_TYPE": "Transit Station,Subway, Bus Terminal",
"APPLICATION_DATE": "2026-07-23",
"STREET_DIRECTION": " ",
"DWELLING_UNITS_LOST": null,
"INTERIOR_ALTERATIONS": 0,
"DWELLING_UNITS_CREATED": null,
"BUSINESS_AND_PERSONAL_SERVICES": 0
}