••• W PENDER STREET
Vancouver, British Columbia, V6C2V6
Upgrade to reveal full addressPermit Details
Location
Work Description
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #450 - 4th floor Interior alterations to provide improvements to this existing vacant office space in this existing commercial building on this site. Scope of work: demo and construction to select areas to alter layout to create and open office area and receiving area. Electrical and mechanical to suit. * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Inferred Trades
Trade tags are inferred from the work description and are not from the original source.
Data Source
Raw Source Data
{
"geom": {
"type": "Feature",
"geometry": {
"type": "Point",
"coordinates": [
-123.116245,
49.2852119
]
},
"properties": {}
},
"address": "800 W PENDER STREET, Vancouver, BC V6C 2V6",
"applicant": "Reotech Construction Ltd. DBA: Reotech Construction Ltd",
"issuedate": "2026-07-23",
"issueyear": "2026",
"yearmonth": "2026-07",
"typeofwork": "Addition / Alteration",
"propertyuse": [
"Office Uses"
],
"geo_point_2d": {
"lat": 49.2852119,
"lon": -123.116245
},
"geolocalarea": "Downtown",
"permitnumber": "BP-2026-02262",
"projectvalue": 81812.5,
"permitcategory": "Renovation - Commercial/ Mixed Use - Lower Complexity",
"applicantaddress": "#108-1550 Hartley Avenue\r\nCoquitlam, BC V3K 7A1",
"permitelapseddays": 16,
"buildingcontractor": "Reotech Construction Ltd",
"projectdescription": "Field Review - Addition / Alteration - #450 - 4th floor \n\nInterior alterations to provide improvements to this existing vacant office space in this existing commercial building on this site. \n\nScope of work: demo and construction to select areas to alter layout to create and open office area and receiving area. Electrical and mechanical to suit. \n\n* District Building Inspector to determine if a Special Sprinkler Inspection is required. \n\nEnergy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).",
"specificusecategory": [
"General Office"
],
"permitnumbercreateddate": "2026-07-07",
"buildingcontractoraddress": "1550 Hartley Av \r\nUnit 108\r\nCoquitlam, BC V3K 7A1"
}