••• W GEORGIA STREET
Vancouver, British Columbia, V6C3E8
Upgrade to reveal full addressPermit Details
Location
Work Description
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #1019 - 10th floor Interior alterations to remove non load bearing partition walls to this existing vacant office space on the 10th floor (#1019) of this existing commercial building on this site. Scope of work: remove partition walls to select areas, doors, millwork, and floor finishes to create an open floor plan. * District Building Inspector to determine if a Special Sprinkler Inspection is required. See BP-2026-00064 for new demising wall. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Inferred Trades
Trade tags are inferred from the work description and are not from the original source.
Data Source
Raw Source Data
{
"geom": {
"type": "Feature",
"geometry": {
"type": "Point",
"coordinates": [
-123.1196238,
49.2836988
]
},
"properties": {}
},
"address": "885 W GEORGIA STREET, Vancouver, BC V6C 3E8",
"applicant": "Tony Kollmuss DBA: Central West Project Management",
"issuedate": "2026-07-22",
"issueyear": "2026",
"yearmonth": "2026-07",
"typeofwork": "Addition / Alteration",
"propertyuse": [
"Office Uses"
],
"geo_point_2d": {
"lat": 49.2836988,
"lon": -123.1196238
},
"geolocalarea": "Downtown",
"permitnumber": "BP-2026-02325",
"projectvalue": 20000,
"permitcategory": "Renovation - Commercial/ Mixed Use - Lower Complexity",
"applicantaddress": "Suite 810 - 609 Granville St\r\nVancouver, BC V7Y 1G5",
"permitelapseddays": 12,
"buildingcontractor": "Central West Project Management Inc.",
"projectdescription": "Field Review - Addition / Alteration - #1019 - 10th floor \n\nInterior alterations to remove non load bearing partition walls to this existing vacant office space on the 10th floor (#1019) of this existing commercial building on this site. \n\nScope of work: \nremove partition walls to select areas, doors, millwork, and floor finishes to create an open floor plan.\n\n* District Building Inspector to determine if a Special Sprinkler Inspection is required. \n\nSee BP-2026-00064 for new demising wall. \n\nEnergy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).",
"specificusecategory": [
"General Office"
],
"permitnumbercreateddate": "2026-07-10",
"buildingcontractoraddress": "609 GRANVILLE ST \r\nUnit 810\r\nVancouver, BC V7Y 1H4"
}