Roof mounted solar panel installation
Building permits
Browse and filter permits by trade, type, status, and location.
Browse and filter permits by trade, type, status, and location.
Roof mounted solar panel installation
Replacement of Fire Alarm Control Panel and remote annunciator
Replacement of Fire Alarm Control Panel and remote annunciator
Clinics, Health Units (642) — (03) Interior Alterations — To construct Interior Alterations (Selective demolition, and modifications to the concrete pit. As wells as mechanical and electrical upgrades to replace the existing equipment with a new Varian LINAC treatment system.) to an existing institute. ”Cross Cancer Institute”
PROPOSAL TO INSTALL 178 SOLAR PANELS 110KW SYSTEM ON THE FLAT ROOFING
PROPOSED REPLACEMENT OF FIRE ALARM CONTROL PANEL
Proposed installation of solar panels to the roof of existing single family dwelling.
Proposed roof mounted solar panel installation
3399 - Motor-Vehicle Misc. — Fire/ Security Alarm — Fire alarm panel replacement
LEAP Project - U of TInstalling a single Heat Recovery Unit (HRU) located on the roof of the existing Block C of the Medical Sciences Building, located at 1 King¿s College Cir., Toronto, ON. The ducts from the HRU will penetrate the east side of the existing precast concrete clad exhaust stack enclosure and connect to existing ductwork and electrical systems.
Installation of a 57.0 kW DC / 60.0 kW AC rooftop solar photovoltaic system: 100 ballasted PV modules on non-penetrating racking (no roof penetrations), rooftop inverter and associated electrical equipment, connected behind the existing main switchboard. Non-export (load displacement) system.
Storage Buildings, Warehouses (460) — (03) Interior Alterations — To construct Interior Alterations (tenant fit up) to an existing industrial building. ”RSR ONLINE SERVICES LTD.” **NO Mechanical, Electrical, or Plumbing work
Proposed repalcement of the exisitng fire alarm control panel.
Proposal for roof mounted solar panels
Proposal for construction of new electrical room and electrical service upgrade
Apartments (310) — (03) Exterior Alterations — To install solar panels on the rooftop of the existing residential apartment building.
Apartments (310) — (03) Exterior Alterations — To install solar panels on the rooftop of the existing residential apartment building.
Relocated existing fire alarm control panel and add fire alarm devices where needed (to permit the entire fire alarm system)
Proposal for interior alterations of a Cardiac Diagnostics & Arrhythmia Clinic. The renovation includes the addition of exam rooms and new plumbing locations. HVAC, plumbing and electrical to be modified
Tim Hortons (#122593) Interior alterations include Plumbing, Electrical & HVAC work. Exterior work will consist of adding new hockey stick door handles and new window film on existing glazing. New Vinyl film on existing glazing. New illuminated "Tim Hortons" script and "Maple Leaf" signage and "Maple Leaf" blade sign to be complete under separate sign permit by sign vendor.
Single Detached House (110) — To construct interior alterations (Basement development, NOT to be used as an additional Dwelling). 1 bedroom, 1 bathroom, living area, electric fireplace.
Apartments (310) — (03) Interior Alterations — To construct Interior Alterations to an existing residential apartment building. Fire alarm system modification: replace the existing conventional Fire Alarm Control Panel with a new conventional Fire Alarm Control Panel (one for one). Replace 2 existing signaling devices with new, existing Initiating devices will be confirmed as compatible. Existing circuits and wiring is to be reused. The sequence of operations from the existing f.a. control panel will not be modified. "Rossdale Residential Apartments" - FA Panel Replacement.
Restaurants and Bars (540) — (03) Interior Alterations — To construct Interior Alterations (architectural, mechanical, electrical, plumbing, and structural work) to an existing building. --Tiffin India's Fresh Kitchen--
Proposed Installation of solar panel on roof top
Proposal to replace aging electric heating system with new mini-split system to provide heating and cooling.
Proposal for repair of tip floor, Upgrades to HVAC system, Upgrades to electrical substation, Replacement of roofing and guardrail. Note that there is no existing life safety system in this building.
Apartments (310) — (03) Exterior Alterations — To install solar panels on the rooftop of the existing residential apartment building.
Retail and Shops (510) — (03) Interior Alterations — To complete interior renovation, including structural and electrical improvements, to support the new layout and equipment for the existing grocery store -- Real Canadian Superstore.
Row Houses (330) — (03) Exterior Alterations — To construct Exterior Alterations to an existing row house/residential building. Installation of solar panel systems on the roof.
Apartments (310) — (03) Exterior Alterations — To install solar panels on the rooftop of the existing residential apartment building.
Proposed replacement of fire alarm control panel, all devices and zoning to remain same.
INTERIOR ALTERATION TO ACCOMMODATE NEW TENANT'S FINISHES, STOREFRONT, UPDATED WASHROOM, CEILING FINISH AND PARTITIONS, UPDATED MECHANICAL AND ELECTRICAL.
Installation of new telecommunications cooling equipment, associated piping, condensate drainage, minor wall penetration, and electrical connections within an existing communications room.
Repairs to balcony guard panels, posts and anchorage to slab. Concrete repairs to balcony topsides and soffits, where required
UNIT C5664, UNION STATIONInstallation of new telecommunications cooling equipment, associated piping, condensate drainage, minor wall penetration, and electrical connections within an existing communications room.Convenience address is 65 Front St W
Installation of new telecommunications cooling equipment, associated piping, condensate drainage, minor wall penetration, and electrical connections within an existing communications room.
PROPOSED INTERIOR ALTERATIONS WITH MECHANICAL, ELECTRICAL AND PLUMBING WORK TO SUIT NEW LAYOUT IN SUITE 210
Replace Existing fire alarm control panel which is obsolete with New. No new zones or devices.
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #1019 - 10th floor Interior alterations to remove non load bearing partition walls to this existing vacant office space on the 10th floor (#1019) of this existing commercial building on this site. Scope of work: remove partition walls to select areas, doors, millwork, and floor finishes to create an open floor plan. * District Building Inspector to determine if a Special Sprinkler Inspection is required. See BP-2026-00064 for new demising wall. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Single Detached House (110) — (01) Building - New — To construct a Residential Use building in the form of a Single Detached House with a 8 solar photovoltaic system panels, uncovered deck (1.52m x 1.83m) and unenclosed front porch.
Proposed repalcement of the exisitng fire alarm control panel.
Replacement of emergency generator.
Proposed interior alterations -fit-out scope remodel of existing Zara store with an additional expansion area, full interior fit out, including structural, mechanical, electrical, fire alarm, sprinkler and plumbing.
Proposed installation of a rooftop photovoltaic (PV) solar system, including racking, solar modules, inverters, electrical equipment, and associated structural and electrical work.
Interior alterations to convert existing building to a Dental Clinic including new interior partitions, treatment rooms, reception, universal washroom, accessibility upgrades, plumbing, HVAC, electrical and associated architectural work. No building addition proposed.
Electrical building and RTU equipment relocation including the re-routing of the incoming Toronto Hydro service (3-Phase) to the new building
Semi-Detached House (210) — (01) Building - New — To construct a Residential Use building in the form of a Semi-Detached House with front attached Garages, unenclosed front porches, uncovered decks (3.66 m x 3.05 m), and to install a Renewable Energy Device (8 Solar-electric (PV) panels on the roof).
Proposal for replacement of the existing make-up air unit on the roof with a similar-sized unit, replacement of the garbage room and electrical room exhaust fans with similar-sized units, and replacement of two vestibule pressurization fans with similar-sized units
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #1500 - 15th floor demised and change to #1502 and #1505 Interior alterations to provide improvements to this existing vacant office space on the 15th floor to demise #1500 into two units (to be #1502 & #1505) in this existing commercial building. Scope of work: remove almost all partition walls, door/frames, new demising wall, plumbing to be capped off, remove all electrical back to source, ceiling tiles to remain. * District Building Inspector to determine if a Special Sprinkler Inspection is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Proposal for interior alterations TO ACCOMMODATE NEW TENANT'S FINISHES, STOREFRONT, UPDATED WASHROOM, CEILING FINISH AND PARTITIONS, UPDATED MECHANICAL AND ELECTRICAL.