Building Permit (All Other Types) — Residential - Alterations - Beam installation
Building permits
Browse and filter permits by trade, type, status, and location.
Browse and filter permits by trade, type, status, and location.
Building Permit (All Other Types) — Residential - Alterations - Beam installation
Building Permit (All Other Types) — Institutional - Repair - Structural(Floors & Walls)
Building Permit (All Other Types) — Residential - Alteration - Steel Beam and Basement Window
Building Permit (All Other Types) — Residential - Alteration - Replacing Wall With Beam
Building Permit (All Other Types) — Residential - Remove LB Wall - Add Beams
Building Permit (All Other Types) — Residential - Alteration - Beam to Replace Wall
Building Permit (All Other Types) — Residential - Alterations - New Steel Beam
Building Permit (All Other Types) — Residential - Interior Alterations - Piping and pump put in for a basement washroom , putting up wall framing for insulation and drywall
Building Permit (All Other Types) — Residential - Interior Alterations - New steel beam
Building Permit (All Other Types) — Residential - Alterations - Interior Beam & Stairs
Building Permit (All Other Types) — Residential - Repair - Structural Fire Damage
Building Permit (All Other Types) — Residential - Alterations - removal of walls, installation of beams
Building Permit (All Other Types) — Residential - Alteration - Fire Structural Damage - Unit 60
PROPOSAL FOR CONSTRUCTION OF REAR FRAMED DECK TO REPLACE STONE PATIO, DETACHED ACCESSORY STRUCTURE WITH POWDER ROOM AND IN GROUND HOT TUB.
Plumbing - Proposal for interior alterations. PROPOSED BASEMENT FINISH, PWD ROOM, KITCHEN ON GROUND FLOOR , 1 WINDOW, 1 MAIN DOOR RPLACED ON GROUND FLOOR, PROPOSED PWD ROOM AND CLOSET, STRUCTURAL CHANGES IN BASEMENT, PROPOSED STUCCO FOR EXTERIOR.
Structural fire damage restoration.
HVAC - Proposal for interior alterations. PROPOSED BASEMENT FINISH, PWD ROOM, KITCHEN ON GROUND FLOOR , 1 WINDOW, 1 MAIN DOOR RPLACED ON GROUND FLOOR, PROPOSED PWD ROOM AND CLOSET, STRUCTURAL CHANGES IN BASEMENT, PROPOSED STUCCO FOR EXTERIOR.
Proposal for interior alterations. PROPOSED BASEMENT FINISH, PWD ROOM, KITCHEN ON GROUND FLOOR , 1 WINDOW, 1 MAIN DOOR RPLACED ON GROUND FLOOR, PROPOSED PWD ROOM AND CLOSET, STRUCTURAL CHANGES IN BASEMENT, PROPOSED STUCCO FOR EXTERIOR.
Rev 01 - Revision for structural modificationsBasement Renovations, and legalize basement apartment
Single Detached House (110) — To construct interior alterations (Basement development, interior framing no load bearing walls change, NOT to be used as an additional Dwelling) with wet bar
Interior alterations to an existing copy and lawyer consultation room to be a new library reading room. Demolish existing load-bearing masonry wall and install new dropped LVL beam.
Proposed interior alterations to existing cafe for a non-structural partition wall to separate customer area from food preparation area and installation of a new handwash sink.
Revision 01: Revision to permit for replacement of two existing foundation walls within the previously approved work area, due to deteriorated structural conditions discovered during exterior waterproofingProposed interior alterations in the basement - rear basement addition and basement underpinning in an existing single family semi-detached dwelling.
Localized concrete repairs, waterproofing repairs at the west stair corbel, installation of new steel portal framing at corbel location
Rev 01 - Revision to structural elements and rear walkout.Proposal for basement underpinning,interior alterations to ground floor kitchen area and second floor rear balcony
Retail and Shops (510) — (05) Structural Frame — To construct a STRUCTURAL FRAME only for a new commercial building for a retail store. --Real Canadian Superstore Riverview--
Installation of temporary tents for Canada Soccer FIFA event: four (4) 10'x20' Tent (Cert# 25 135805 000 00); ten (10) 10'x10' Century Frame -Tent (Cert# 25 135802 000 00); and one (1) 6mx6m Sierra tent with glass walls. All tents are anchored with concrete weights. Install is June 1, 2026. Event is June 9 - July 2, 2026. Removal is July 3, 2026.
Plumbing - Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifications and finish upgrades.
Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation: Friday, June 5, 2026 and dismantle on Sunday, June 7, 2026
Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifications and finish upgrades.
HVAC - Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifications and finish upgrades.
Proposed interior alterations of existing structural beam replacement with new steel beam, load bearing wall removal and replacement with new steel beam, and interior alterations (door to garage, laundry, mudroom, kitchen, primary ensuite/wic)
Proposal to remove existing load bearing wall and replace post and beam, replacing existing kitchen at ground floor, new washrooms at second floor, alteration for the basement
Rev 01 - Proposed structural changes - Pad footing installed in the basement, steel beam installed in lieu of 4ply lvl, new stairs to second floor installed, new bedroom window installed on second floor, and load bearing wall moved at winder stairs.Proposal for domolishing existing interior wall and construct new walls on the main floor.
Plumbing - Proposal to remove existing load bearing wall and replace post and beam, replacing existing kitchen at ground floor, new washrooms at second floor, alteration for the basement
Plumbing - Proposed interior alterations of existing structural beam replacement with new steel beam, load bearing wall removal and replacement with new steel beam, and interior alterations (door to garage, laundry, mudroom, kitchen, primary ensuite/wic)
Proposal for interior alterations for spa/bathing room, including accessible shower/washroom upgrades, plumbing fixtures replacements, finishes, minor non-structural partitions/doors, lighting/electrical & mech/exhaust coordination.
Plumbing - Proposal for frame balcony and interior alterations.
Drain - Proposal for frame balcony and interior alterations.
Structural rehabilitation of the underground parking garage and podium deck of an existing condominium townhouse complex.
Proposal for frame balcony and interior alterations.
Addition / Alteration — Renovation - Residential - Lower Complexity — Field Review - Addition / Alteration - #2002- 1201 MARINASIDE CRESCENT Open BP field review Interior alterations to provide residential improvements on the 20th Level (#2002) of this existing mixed-use building on this site. Scope of work: reno to bath, Kitchen and relocation of Enclosed balcony door Schedule D may be required by District Building Inspector to be determined on site. OK for field review as per Ankur H, June 1, 2026. Structural B submitted by KE JIAN, MA,P.ENG,STRUCT .ENG 778-877-9016
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #1200 - 12th floor Interior alterations to provide improvements for a new full floor office tenant on the 12th floor (#1200) of this existing commercial building on this site. Scope of work: to remove partition walls and doors/frames to select areas to alter layout and create an open floor plan. New card reader, milllwork. Electrical, Plumbing/Mechanical, & Sprinklers to suit. * In accordance with VBBL 2025 Letters of Assurance submitted: - Schedule A and Architectural Schedule B by -Jason Santeford, Architect, AIBC. (604) 334-6371. - Electrical Schedule B by - Roger Dupuis, P.Eng., P.Eng. ph# 604.569.6500 . -Mechanical/Plumbing Schedule B- Joseph Braun, P.Eng ph# 604-609-0500 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #600 - 6th floor Interior alterations to provide improvements for a new full floor office tenant on the 6th floor (#600) of this existng commercial building on this site. Scope of work: Demo to select areas to alter layout including the construction of new partition walls, doors/frames, millwork, finsihes, lighting. Electrical & Plumbing/Mechanical. *District Building Inspector to determine if a Special Sprinkler Inspection is required. Letters of Assurance submitted: - Schedule A and Architectural Schedule b by Ken G Wong AIBC. Architect. Ph#604-899-4549. - Electrical Schedule B by - Cameron Ballard, P.Eng ph#(604) 347-9722 - Mechanical Schedule B by - Joseph Braun, P.Eng. ph#604-609-0500 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #710 - 7th floor Interior alterations to provide improvements to this existing vacant office space on the 7th floor (#710) of this existing commercial heritage building on this site. Scope of work: demo/remove partitions to select areas to alter layout including adding an addition of a washroom, doors/frames, millwork, finishes. Electrical, plumbing, sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Plumbing - Proposal for finished basement, installing steel beams, and steel posts, footings, and walk-up separate entrance for addtional unit in basement.
Drain - Proposal for finished basement, installing steel beams, and steel posts, footings, and walk-up separate entrance for addtional unit in basement.
Plumbing - 2ND FLOOR BATHROOM LAYOUT CHANGE, 1ST FLOOR BEAM/COLUMN INSTALL & HALFWALL
Proposal to erect a 20'x60' white frame tent. Install date July 3, removal July 7th.
Addition / Alteration — Renovation - Residential - Lower Complexity — Field Review - Addition / Alteration - 2352 W 7th Avenue Interior alterations to remove partition walls and add beams to 2352 W 7th Avenue of this existing duplex building on this site. Okay for field review as per J.Ly, May 25, 2026 Schedule B (Structural) provided by NKV Engineering & Consulting Ltd. - N.K. Varshney, P.Eng. Ph#: 778-868-8716 Separate permits required for garage conversion