Building permits
Browse and filter permits by trade, type, status, and location.
Browse and filter permits by trade, type, status, and location.
Proposed interior alterations to an existing office floor, including return-to-base work, washroom renovations, and associated HVAC and plumbing alterations.
Malls, Office/Retail (512) — (01) New — To construct a new commercial building(6 RTU's) with 2 - 2 hrs FRR demising walls. -- Desrochers Village Shopping Centre - CRU F * Separate permit applications are required for tenant improvements.
Proposal for non-structural roofing replacement for the Boiler Building at TTC¿s Greenwood Yard Complex, 400 Greenwood Avenue.
Retail and Shops (510) — (01) New — To construct a new two-story commercial SHELL ONLY building (with 2 - 2hr demising walls on the main floor at gridline 5 & 7, 26 RTU's for future retail, office, daycare (with rooftop playground) uses - Ambleside Pointe. NOTE: CRU Tenant fit-up and tenant demising walls NOT included and requires separate permits
Proposal for interior demolition to suite 3210 to bring back to base condition including HVAC
Replace existing roof mounted exhaust fans (EF-2.1,29,30), Replace existing pumps, CP-5 and CP-6 found in mechanical room E045, Replace existing pump, CP-11 and CP-14 found in mechanical room 55, Replace existing pump, M-42 found in mechanical room 55, Replace the existing air handling units, AHU-311 and AHU-319 within 3rd floor mechanical rooms in 311 and 319.
Service Stations, Repair Garages (572) — (03) Interior Alterations — To construct Interior Alterations (adding an automotive repair facility including installation of vehicle hoists, associated electrical work, HVAC/mechanical ventilation modifications including make-up air ONLY) within an existing commercial bay - Evolved Autoworks.
Post-secondary Institutions (624) — (03) Interior Alterations — To construct Interior Alterations to an existing assembly building. HVAC upgrade basement and main floor, 7 new RTUs, new roof access ladder. "Edmonton Academy"
Replacement of domestic water heating system & heating boilers, piping and accessories in basement and penthouse.
Interior alterations to floors 1-4 including building, pluming and HVAC.
Demolition of existing partitions. Construction of new partitions. Modification of existing HVAC and sprinklers.
HVAC ductwork with existing RTU
Replacement of domestic water heating system & heating boilers, piping and accessories in basement and penthouse.
Proposal for commercial kitchen ventilation.
Proposed is a one story 24 sqm ancillary building to house a workshop and electric sauna, and includes a new sink (requires plumbing and drain permit) as well as new air source heat pump for heating and cooling.
Interior alterations to create a dental office . T-Bar ceiling. Complete plumbing, HVAC, sprinklers, fire alarm and electrical fit out. Flooring, painting, millwork and all other interior finishes - Unit 401
Proposed Fire alarm upgrades to existing 2-storey + basement shelter with reference to Section 11 of the OBC (the performance of the fire alarm system shall be at least equal to the performance level prior to this alteration). Fire alarm work only, no changes to other systems (partition, ceiling, HVAC, etc.) under this application.
Retail and Shops (510) — (03) Interior Alterations — To construct Interior Alterations (to construct 2 - 2hr demising walls on grid lines 7 and 8, 2 new electrical panels, and HVAC extension) to an existing commercial building. ”WEST POINT SOUTH BUILDING 10”
Malls, Office/Retail (512) — (04) Footing & Foundation — FOOTING AND FOUNDATION ONLY for a new commercial building(6 RTU's) with 2 - 2 hrs FRR demising walls. (future restaurant and 2 retail locations for cannabis and liquor) -- Desrochers Village Shopping Centre - CRU F
Replacement of two (2) existing domestic hot water boilers and associated mechanical systems, including pumps, controls, venting, gas piping, condensate piping and related work in the mechanical room.
Interior renovation for a noodle restaurant, including building plumbing and HVAC work
Malls, Office/Retail (512) — (01) New — To construct a new single storey multiple tenant (3 CRU's) commercial building (includes 2 - 2 hrs FRR demising walls, 6 RTU's. Shell only. -- Desrochers Village Shopping Centre - CRU D * Separate permit applications are required for tenant improvements.
Proposed demolition of interior partitions and construction of new partition walls and washrooms, with complete electrical and HVAC installations.
Single Detached House (110) — To construct interior alterations to a Residential Use building (adding plumbing to bedroom 2 for pedicure chair and hvac for nail station and hair washing sink to bedroom 3, NOT to be used as an additional Dwelling); for Home Based Business (Personal Services - hair/nail salon). -- SILVER STONE HAIR & ESTHETICS --
Proposal to demolish four (4) interior non-load-bearing wing wall partitions and one (1) central non-load-bearing partition on the sales floor. Scope includes patching of adjacent finishes only. No new construction or modifications to the existing HVAC, sprinkler, or fire alarm systems are proposed. Area calculated based on the partitions affected by the work.
REVISION TO PERMIT 25-7728 - ALTERATIONS TO HVAC SYSTEM