Proposed remove five offices to create open space. Create an opening between suite 618 and 619.
Building permits
Browse and filter permits by trade, type, status, and location.
Browse and filter permits by trade, type, status, and location.
Proposed remove five offices to create open space. Create an opening between suite 618 and 619.
Proposal for interior alteration to existing group D space.
1115 - Hot Tub — Alteration — Hot Tub
Clinics, Health Units (642) — (03) Interior Alterations — To construct Interior Alterations. Create an opening in the existing demising wall. Expand a pharmacy (2631) into the next unit (2627)and add medical offices in the new space.
Proposal for interior fit-out of new office space to existing Group D occupancy on the 14th floor.
1115 - Hot Tub — Alteration — Hot Tub
1115 - Hot Tub — Alteration — Hot Tub
Post-secondary Institutions (624) — (03) Interior Alterations — To change the use from office to commercial school (Group D to A2) and complete interior renovations to expand the educational and office space within the existing commercial building - Sundance College.
Proposed alterations for the build-out of office space of floors 3, 4, 6, 7, 15, 16.See also 26-155335 BLD 00 BA
Proposal to construct a mezzanine floor to be used as storage space.
Installation of two 2/4 inch BFP in the mechanical room serviceing two building - for the shared swimming pool. builidng linked by underground parking.
1115 - Hot Tub — Alteration — Hot Tub
1115 - Hot Tub — Alteration — Hot Tub
Malls, Office/Retail (512) — (03) Interior Alterations — To construct Interior Alterations (Return to empty shell space) to an existing Mall
Proposed convert ex. Garage into the office space & rear addition
Proposal for the installation of 1 maglock at southeast hub space door
Proposed ancillary rear yard structure composed of a covered cooking area and uncovered collonade space framed by a seriesof piers and beams.
Proposal to demo existing garage and wood deck to construct a new single storey addition in rear yard at main level, Including interior alterations and heated crawl space.
Converting existing classroom into maker space.
1115 - Hot Tub — Alteration — Hot Tub
Proposed interior alteration - renovation consists of the interior conversion of an existing office building into a 162-key Marriott hotel. The existing ground-floor retail spaces will remain as-is, with no modifications to their current use or layout.
Day Cares, Nursing Homes (650) — (03) Interior Alterations — To change the use from Office (D) to Child Care Services (A2) and to construct interior and exterior alterations, including converting a portion of the existing on site parking spaces to two outdoor play spaces. "Star Miracles Daycare and OSC"
Single Detached House (110) — To construct interior alterations (Basement development, NOT to be used as an additional Dwelling). (bathroom, zen space, storage, media, cat room and mechanical room).
Retail and Shops (510) — (03) Interior Alterations — To construct Interior Alterations (ceilings, lighting, mechanical and finishes) of retail space within a shopping mall. --Sukoshi Kingsway--
Single Detached House (110) — (01) Building - New — To construct a Residential Use building in the form of a Single Detached House with front attached Garages, unenclosed front porch, fireplaces, balcony, Basement development (with kitchen and wet bar, NOT to be used as an additional Dwelling), rear uncovered deck (16.45m x 4.87m), rear covered deck (5.03m x 2.88m), rear covered balcony (5.03m x 2.88m), rear covered balcony with hot tub (6.25m x 3.70m), rear covered balcony (10.21m x 5.92m), front balcony (4.06m x 3.54m), and front balcony (4.57m x 1.52m).
Site Services - Construction of a new building. 13 ST, 202 Retirement units, 31 rental units. One level below grade, and the construction of a new POPs space along the west property line.
Proposal for interior alteration sto existing office space - UNIT 500
Construction of a new building. 13 ST, 202 Retirement units, 31 rental units. One level below grade, and the construction of a new POPs space along the west property line.
Retail and Shops (510) — (03) Interior Alterations — To construct Interior Alterations (initial tenant fitup) for Personal Services. Include 2 demising walls. W BEAUTY SPA.
Proposed interior alterations to office space of People Corporation Sheppard - new reception and small partition changes
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - 1125 Vernon Drive Interior alterations to add a storage room in this existing Wholesale - Class A space at 1125 Vernon Drive of this existing commercial building on this site. Okay for FR as per I.Celic July 13, 2026 Schedule A provided by Andrew Igel | Igel Architecture LTD. | 778-839-4260 Schedule B (Architectural) provided by Andrew Igel | Igel Architecture LTD. | 778-839-4260 Schedule B (Mechanical) provided by Scott Stanger, P.Eng| Bycar Engineering LTD. | 604-591-2766
Indoor Recreational Buildings (560) — (03) Interior Alterations — To complete change the use from Retail to Assembly Group A Division 2 Gymnasium and to construct Interior alterations to existing space. Fairgrounds Public Racket Club.
Retail and Shops (510) — (03) Interior Alterations — To construct Interior Alteration (addition of 2 water closets and increase the occupant load to 17 persons only) to an existing tenant space in a mixed use building. "Latitude 53 Art Gallery"
Retail and Shops (510) — (03) Interior Alterations — To construct Interior Alterations (convert staff room to washroom) to a spa in an existing commercial building. "Oceanic Massage Spa"
Office Buildings (520) — (03) Interior Alterations — To construct Interior Alterations 10th floor of an office building. Expanding the existing office area to occupy all of level 10 and renovate the expanded space in an existing commercial building. ”Yardstick Technologies Inc.”
1115 - Hot Tub — Alteration — Hot Tub
1115 - Hot Tub — Alteration — Hot Tub
Proposal for interior alterations of existing office suites. Work includes new interior partitions for offices and meeting rooms within existing spaces.
Proposal for interior alteration to create a new SPA - UNIT C11
Demolition of the existing rear garage and proposed construction of a new wood pergola in the rear yard. The proposed pergola area is 253 sq. ft. and the proposed height is 13 ft.The existing parking space will remain in the same location after demolition of the garage.The scope of work also includes the installation of a new 6 ft high fence along the east and north sides of the parking area, and the installation of a new gate at the front of the parking area.
Proposal for interior alterations to convert vacant commercial space to a dental office - UNITS 3 & 4Convenience address is 1662-1664 Bloor St W.
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - #1019 - 10th floor Interior alterations to remove non load bearing partition walls to this existing vacant office space on the 10th floor (#1019) of this existing commercial building on this site. Scope of work: remove partition walls to select areas, doors, millwork, and floor finishes to create an open floor plan. * District Building Inspector to determine if a Special Sprinkler Inspection is required. See BP-2026-00064 for new demising wall. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
1201 - Private Swimming Pool — Alteration — Private Swimming Pool
Addition / Alteration — Renovation - Commercial/ Mixed Use - Lower Complexity — Field Review - Addition / Alteration - 908 Raymur Avenue Interior alterations to install racking in the existing Repair Garage space at 908 Raymur Avenue on the 1st and 2nd level of this existing industrial building on this site. Okay for FR as per I.Celic July 9, 2026 Schedule B (Structural) provided by Erik Ulmer, P.Eng | Ulmer Engineering LTD. | 778-879-9258
1115 - Hot Tub — Alteration — Hot Tub
Single Detached House (110) — To construct interior alterations (Basement development, NOT to be used as an additional Dwelling) and to construct exterior alterations (Completing a basement development with the installation of new windows. 4 windows will be cut deeper with no change in width while 1 window will be new. Teleposts will be reconfigured with the installation of a new beam with posts and pads to open the space. ) and wet bar
Proposed 4 - storey municipal shelter with 51 beds and program support space
Drain - Proposed 4 - storey municipal shelter with 51 beds and program support space
Proposal for selective demolition of interior office space - FLOOR 32, "National Bank of Canada"
Proposed interior alterations to relocate an existing service corridor door within existing dental office and create additional storage space.